Commercial · 2023

Central Business Tower

An eighteen-storey office tower with a reinforced concrete core, handed over floor by floor so early tenants could occupy while the upper levels finished.

Glass and steel office towers seen looking up from street level.Commercial
Site overview
  • A high-rise concrete frame under construction with two tower cranes above it.
    Frame and cranes
  • The curtain-wall facade of a tower seen looking straight up its corner.
    Curtain wall
  • The finished glass elevation of an office building at street level.
    Completed elevation

Overview

The core was slipformed ahead of the floor plates, which set the pace for everything above ground. Working to a seven-day floor cycle meant formwork, rebar and pour sequencing had to be planned as one operation rather than three trades taking turns.

Sectional handover was written into the contract from the start. We separated services floor by floor, provided temporary fire and lift strategies for the occupied levels, and kept construction traffic isolated from tenant access throughout.

Scope of works

  • Piled foundations and three-level basement
  • Slipformed RC core and post-tensioned floor plates
  • Unitised curtain wall envelope
  • Sectional handover with live tenant floors

Project Spec

Location
Central District
Client
[Client Name]
Value
[Contract Value]
Duration
26 months
Storeys
18 above ground